Check your understanding of Module 4, Unit 2. This quiz contains 12 questions. Select one answer for each question. You may retry the quiz.
0 of 12 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 12 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Which statement best describes the role of a building substation?
What is the defining feature of an indirect building connection?
Which statement about a direct connection is correct?
What is the main purpose of a differential-pressure controller?
In a direct space-heating HIU with local instantaneous DHW preparation, which description is correct?
Which dwelling arrangement commonly uses one heat exchanger for space-heating separation and a second heat exchanger for instantaneous DHW?
Which set of elements is required for a thermal energy meter to determine transferred heat?
What does a heat meter installed at the building substation boundary normally measure?
A meter shows supply temperature 62°C, return temperature 58°C and flow 420 L/h. What are the approximate ΔT and heating power?
During confirmed heating demand, the meter shows high flow and a small ΔT. What is the best interpretation?
Which action is appropriate during a routine site acceptance check of a billing heat meter?
The interface appears to provide heat, but the installed arrangement differs from the approved schematic and no commissioning record is available. What should happen?
